Waste Management Complex Jalalabad, Afghanistan

Project Highlights

Design Works - design of
16 tons/day capacity incineration system (2 x 8 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tank, etc
covered storage and sorting facility – pre-engineered steel structure
admin building – concrete framing structure with CMU in fill wall
site electrical services and utility connections (water, sewer, gas) and paving and walks


Construction Works – construction of 
16 tons/day capacity incineration system (2 x 8 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tank, etc.
covered storage and sorting facility – pre-engineered steel 
structure framing on reinforced concrete slab on grade 
(500 m2; min height clearance– 5 m)
admin building – one story building (concrete framing 
structure with CMU in fill wall; 70 m2) 
site electrical services including 400 KVA transformer, 
MDP panel, site lighting
utility connections - water and sewer utility connections
and water storage tank (50 tons). 
Paving and walks