Waste Management Complex, Bagram, Afghanistan

Project Highlights

Design Works - design of
32 tons/day capacity incineration system (2 x 16 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tanks
ash landfill
covered storage and sorting facility – pre-engineered steel structure
admin building – concrete framing structure with CMU in fill wall
site electrical services and utility connections (water, sewer) and paving and walks


Construction Works – construction of 
32 tons/day capacity incineration system (2 x 16 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tanks
covered storage and sorting facility – pre-engineered steel structure framing on reinforced concrete slab on grade (1 500 m2; min height clearance– 5 m)
admin building – one story building (concrete framing structure with CMU in fill wall; 70 m2) 
site electrical services- 2 x 140 kVA generators;
communication system cabling – 400 m; grounding
cable–500 m; fire protection system cabling– 100 m;  
lighting cable – 3000 m
utility connections - water and sewer utility 
connections; water storage tank for incinerators
(50 tons), water storage tank for sorting pad –
15 000 l, fuel storage tank– 10 m3, fuel storage
tank for generator – 5 m3. 
Paving and walks 
Fencing