Demet Kent

Ankara, TURKEY

Cesme Sheraton

Cesme Izmir, TURKEY

Conrad Hotel

Istanbul, TURKEY

Construction Site

DLA Warehouse, Kandahar, Afghanistan

On The Go!

Safety First!

Military Projects

ANP Border Police 6th Brigade HQ Herat, Afghanistan

Steel Erection

Waste Management Complex Jalalabad, Afghanistan

Industrial Constructions

Noksel Factory Cooling Facility Modification and New Welding Line Project, Hendek, TURKEY

About OCT



OCT Construction Contracting Trade and Industry Limited Company






O.C.T. Construction © 2012-2014












-

Alpha Ramp Extension Project



Alpha Ramp Extension Project
Kandahar, Afghanistan



Theatre Map Depot Building



Theatre Map Depot Building
Kandahar, Afghanistan

Border Patrol Common HQ (Zone A)









Border Patrol Common HQ (Zone A) Herat, Afghanistan

ANP Border Police 6th Brigade HQ















ANP Border Police 6th Brigade HQ

Zakho Military Academy





Zakho Military Academy

Noksel Factory Cooling Facility Modification and New Welding Line Project

Noksel Factory Cooling Facility Modification and New Welding Line Project
Noksel Factory Cooling Facilitiy Modification Project, Hendek, TURKEYNoksel Factory Cooling Facilitiy Modification Project, Hendek, TURKEY

Waste Management Complex, Bagram, Afghanistan

Project Highlights

Design Works - design of
32 tons/day capacity incineration system (2 x 16 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tanks
ash landfill
covered storage and sorting facility – pre-engineered steel structure
admin building – concrete framing structure with CMU in fill wall
site electrical services and utility connections (water, sewer) and paving and walks


Construction Works – construction of 
32 tons/day capacity incineration system (2 x 16 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tanks
covered storage and sorting facility – pre-engineered steel structure framing on reinforced concrete slab on grade (1 500 m2; min height clearance– 5 m)
admin building – one story building (concrete framing structure with CMU in fill wall; 70 m2) 
site electrical services- 2 x 140 kVA generators;
communication system cabling – 400 m; grounding
cable–500 m; fire protection system cabling– 100 m;  
lighting cable – 3000 m
utility connections - water and sewer utility 
connections; water storage tank for incinerators
(50 tons), water storage tank for sorting pad –
15 000 l, fuel storage tank– 10 m3, fuel storage
tank for generator – 5 m3. 
Paving and walks 
Fencing

DLA Warehouse, Kandahar, Afghanistan

DLA Warehouse Kandahar, Afghanistan
Works Performed Under the Project

The project covers the design and construction of a permanent, non-combustible, dock height general-purpose warehouse facility with approx. 16,112 sqm of floor space, conceived as 4 warehouses, 7.62m clear stacking height, loading docks with dock levelers, weather-sealed truck doors, and concrete floor slab. The warehouses are pre-engineered metal buildings. Supporting facilities include connection to all utilities, asphalt paved roadways and aprons, crushed stone truck parking and staging areas, perimeter fencing. 

DLA Warehouse Kandahar, AfghanistanDLA Warehouse Kandahar, Afghanistan


DLA Warehouse Kandahar, Afghanistan

Waste Management Complex Jalalabad, Afghanistan

Project Highlights

Design Works - design of
16 tons/day capacity incineration system (2 x 8 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tank, etc
covered storage and sorting facility – pre-engineered steel structure
admin building – concrete framing structure with CMU in fill wall
site electrical services and utility connections (water, sewer, gas) and paving and walks


Construction Works – construction of 
16 tons/day capacity incineration system (2 x 8 tons/day incinerator units) with loader, ash remover, ash conveyor, scrubber, fuel tank, etc.
covered storage and sorting facility – pre-engineered steel 
structure framing on reinforced concrete slab on grade 
(500 m2; min height clearance– 5 m)
admin building – one story building (concrete framing 
structure with CMU in fill wall; 70 m2) 
site electrical services including 400 KVA transformer, 
MDP panel, site lighting
utility connections - water and sewer utility connections
and water storage tank (50 tons). 
Paving and walks